Michael C Vorster
Sections Taught: 19
Difficulty: N/A
Rating: N/A
Would Recommend: N/A
ID | Title | GPA | Sections Taught |
---|---|---|---|
BC-4024 | Estimating, Production, and Cost Engineering | 3.41 | 2 |
CEE-3014 | Construction Management | 3.01 | 1 |
CEE-4014 | Estimating, Production, and Cost Engineering | 3.30 | 5 |
CEE-4074 | Construction Engineering: Means and Methods | 3.35 | 7 |
CEE-5024 | Contract Administration and Claims Resolution | 3.87 | 1 |
CEE-5054 | Project Control of Built Infrastructure | 3.94 | 1 |
CEE-5984 | Special Study | 3.75 | 2 |