BC-4024: Estimating, Production, and Cost Engineering
Description: Interpretation of plans and specifications, preparation of construction estimates, and cost control. Methods analysis, resource requirements, and resource costs in building systems, including system components, and in large-scale civil engineering works such as highways, bridges, and hydraulic structures.
Pathways: N/A
Course Hours: 3 credits
Sections Taught: 2
Average GPA: 3.42 (rounds to B+)
Strict A Rate (No A-) : 10.00%
Average Withdrawal Rate: 0.00%
Michael Biscotte | 2024 | 60.0% | 20.0% | 20.0% | 0.0% | 0.0% | 0.0% | 3.22 | 1 |
Sunil K Sinha | 2021 | 83.3% | 16.6% | 0.0% | 0.0% | 0.0% | 0.0% | 3.61 | 1 |