BC-4024: Estimating, Production, and Cost Engineering
Description: Interpretation of plans and specifications, preparation of construction estimates, and cost control. Methods analysis, resource requirements, and resource costs in building systems, including system components, and in large-scale civil engineering works such as highways, bridges, and hydraulic structures.
Pathways: N/A
Course Hours: 3 credits
Sections Taught: 5
Average GPA: 3.37 (A-)
Strict A Rate (No A-) : 27.52%
Average Withdrawal Rate: 0.00%
Sunil K Sinha | 2021 | 51.6% | 48.3% | 0.0% | 0.0% | 0.0% | 0.0% | 3.41 | 2 |
Michael C Vorster | 2007 | 48.8% | 48.9% | 0.0% | 0.0% | 2.4% | 0.0% | 3.41 | 2 |
Michael Biscotte | 2024 | 60.0% | 20.0% | 20.0% | 0.0% | 0.0% | 0.0% | 3.22 | 1 |