CEE-4014: Estimating, Production, and Cost Engineering
Description: Interpretation of plans and specifications, preparation of construction estimates, and cost control. Methods analysis, resource requirements, and resource costs in building systems, including system components, and in large-scale civil engineering works such as highways, bridges, and hydraulic structures.
Pathways: N/A
Course Hours: 3 credits
Sections Taught: 18
Average GPA: 3.44 (rounds to B+)
Strict A Rate (No A-) : 29.66%
Average Withdrawal Rate: 0.00%
| Earl W Shealy | 2022 | 53.7% | 42.5% | 3.8% | 0.0% | 0.0% | 0.0% | 3.46 | 3 |
| Michael Biscotte | 2024 | 46.7% | 42.7% | 9.9% | 0.3% | 0.4% | 0.0% | 3.32 | 10 |
| Sunil K Sinha | 2024 | 82.4% | 15.5% | 1.2% | 0.0% | 0.9% | 0.0% | 3.73 | 3 |
| Michael J Garvin | 2020 | 68.7% | 28.7% | 1.3% | 0.0% | 1.3% | 0.0% | 3.59 | 2 |