CEE-4014: Estimating, Production, and Cost Engineering
Description: Interpretation of plans and specifications, preparation of construction estimates, and cost control. Methods analysis, resource requirements, and resource costs in building systems, including system components, and in large-scale civil engineering works such as highways, bridges, and hydraulic structures. A grade of C- or better required in pre-requisite 3014.
Pathways: N/A
Course Hours: 3 credits
Sections Taught: 53
Average GPA: 3.43 (A-)
Strict A Rate (No A-) : 34.15%
Average Withdrawal Rate: 0.11%
Sunil K Sinha | 2021 | 72.0% | 26.6% | 1.1% | 0.0% | 0.3% | 0.0% | 3.63 | 14 |
Earl W Shealy | 2022 | 61.1% | 36.0% | 2.9% | 0.0% | 0.0% | 0.0% | 3.53 | 6 |
Michael Biscotte | 2024 | 46.6% | 44.2% | 8.5% | 0.3% | 0.4% | 0.0% | 3.33 | 10 |
John C Hildreth | 2007 | 30.0% | 55.0% | 15.0% | 0.0% | 0.0% | 0.0% | 3.17 | 1 |
Berk Uslu | 2016 | 66.6% | 23.8% | 0.0% | 9.6% | 0.0% | 0.0% | 3.45 | 1 |
Denise R Simmons | 2017 | 54.9% | 34.6% | 2.9% | 4.5% | 1.6% | 1.6% | 3.37 | 2 |
Michael M Branch | 2008 | 47.2% | 47.2% | 4.4% | 0.0% | 1.1% | 0.0% | 3.35 | 4 |
Robert W Muir | 2017 | 53.7% | 39.3% | 5.6% | 0.0% | 0.0% | 1.3% | 3.47 | 2 |
Victoria A Mouras | 2013 | 23.6% | 68.2% | 6.4% | 0.9% | 0.8% | 0.0% | 3.16 | 6 |
Michael J Garvin | 2020 | 68.7% | 28.7% | 1.3% | 0.0% | 1.3% | 0.0% | 3.59 | 2 |
Michael C Vorster | 2009 | 36.0% | 59.9% | 3.9% | 0.0% | 0.2% | 0.0% | 3.30 | 5 |