Odysseus Logo

Virginia Tech

CEM-3024: Construction Estimating and Scheduling

Description: Introduction to estimating and scheduling of construction operations using construction documents. Quantity takeoff, resource and crew enumeration, network logic, activity durations, Critical Path Method (CPM) and Location-Based Management System (LBMS). Bid assembly with markups. Construction decisions based on ethical principles. A grade of C- or better is required in prerequisite.

Pathways: N/A

Course Hours: 3 credits

Prerequisites: BC-2024 or CEM-2104

Required By: CEM-4445

Corequisites: N/A

Crosslist: N/A

Repeatability: N/A

Sections Taught: 12

Average GPA: 2.60 (rounds to B-)

Strict A Rate (No A-) : 4.82%

Average Withdrawal Rate: 0.86%

Charles J Smith20248.1%47.5%35.2%7.9%1.0%0.2%2.5310
Ashley L Johnson201934.2%37.1%17.9%5.3%1.3%4.2%2.992

Grade Distribution Over Time