Odysseus Logo

Virginia Tech

CEM-3024: Construction Estimating and Scheduling

Description: Introduction to estimating and scheduling of construction operations using construction documents. Quantity takeoff, resource and crew enumeration, network logic, activity durations, Critical Path Method (CPM) and Location-Based Management System (LBMS). Bid assembly with markups. Construction decisions based on ethical principles. A grade of C- or better is required in prerequisite.

Pathways: N/A

Course Hours: 3 credits

Prerequisites: BC-2024 or CEM-2104

Required By: N/A

Corequisites: N/A

Crosslist: N/A

Repeatability: N/A

Sections Taught: 13

Average GPA: 2.70 (B)

Strict A Rate (No A-) : 5.55%

Average Withdrawal Rate: 0.79%

Charles J Smith20247.9%48.5%34.6%7.7%1.1%0.2%2.539
Ashley L Johnson201929.9%51.1%12.7%3.5%0.7%2.1%3.094

Grade Distribution Over Time