CEM-3024: Construction Estimating and Scheduling
Description: Introduction to estimating and scheduling of construction operations using construction documents. Quantity takeoff, resource and crew enumeration, network logic, activity durations, Critical Path Method (CPM) and Location-Based Management System (LBMS). Bid assembly with markups. Construction decisions based on ethical principles. A grade of C- or better is required in prerequisite.
Pathways: N/A
Course Hours: 3 credits
Corequisites: N/A
Crosslist: N/A
Repeatability: N/A
Sections Taught: 13
Average GPA: 2.70 (B)
Strict A Rate (No A-) : 5.55%
Average Withdrawal Rate: 0.79%
Charles J Smith | 2024 | 7.9% | 48.5% | 34.6% | 7.7% | 1.1% | 0.2% | 2.53 | 9 |
Ashley L Johnson | 2019 | 29.9% | 51.1% | 12.7% | 3.5% | 0.7% | 2.1% | 3.09 | 4 |