Odysseus Logo

Virginia Tech

BC-5024: Cost Management of the Building Process

Description: A study of cost management procedures applicable to the building process from concept through owner operations. Cost considerations in the decision process, concepts for monitoring and controlling costs, and the determination of accountability are examined. Pre: Graduate standing.

Pathways: N/A

Course Hours: 3 credits

Prerequisites: N/A

Required By: N/A

Corequisites: N/A

Crosslist: N/A

Repeatability: N/A

Sections Taught: 3

Average GPA: 3.75 (rounds to A-)

Strict A Rate (No A-) : 48.93%

Average Withdrawal Rate: 0.00%

James H Yauger202086.7%13.3%0.0%0.0%0.0%0.0%3.822
Thomas H Mills202470.6%29.4%0.0%0.0%0.0%0.0%3.601

Grade Distribution Over Time

1234GPA
Spring 2019Spring 2020Spring 2024Term050% W