BC-2014: Construction Principles I
Description: Fundamentals of the construction technology and process emphasizing project management/operations, materials and methods. Utilization of industry-specific technology/software applications, techniques and sequences/project loading for the construction of buildings in compliance with Construction Specifications Institute (CSI) Divisions 00-05, 31, 32, 33. Planning, scheduling, materials cost analysis, job-appropriate equipment and labor requirements, masonry applications, concrete and formwork. Site preparation and utilization, use of construction industry-specific software, interpretation of project drawing documents. Integration of project safety and health issues. Quantity surveying for the management of construction resources, according to current principles and industry standards.
Pathways: N/A
Course Hours: 3 credits
Corequisites: N/A
Crosslist: N/A
Repeatability: N/A
Sections Taught: 50
Average GPA: 3.19 (B+)
Strict A Rate (No A-) : 25.64%
Average Withdrawal Rate: 0.26%
Andrew P Mccoy | 2016 | 44.9% | 52.8% | 2.4% | 0.0% | 0.0% | 0.0% | 3.46 | 4 |
Thomas H Mills | 2017 | 26.2% | 53.6% | 20.2% | 0.0% | 0.0% | 0.0% | 3.05 | 3 |
David S Goldsmith | 2017 | 42.3% | 44.0% | 11.4% | 1.4% | 0.6% | 0.3% | 3.21 | 10 |
Bruce E Ferguson | 2012 | 55.2% | 38.5% | 3.1% | 0.0% | 3.1% | 0.0% | 3.38 | 2 |
Graff Aleksandra Markovic | 2023 | 43.9% | 38.4% | 13.3% | 2.2% | 1.5% | 0.7% | 3.21 | 16 |
Ki Hong Ku | 2010 | 45.1% | 43.5% | 9.7% | 0.5% | 1.2% | 0.0% | 3.26 | 4 |
Jeremy W Withers | 2021 | 14.3% | 52.4% | 33.3% | 0.0% | 0.0% | 0.0% | 2.72 | 1 |
Annie R Pearce | 2008 | 49.0% | 38.5% | 10.8% | 1.4% | 0.4% | 0.0% | 3.30 | 5 |
Xuan Lv | 2023 | 42.8% | 35.9% | 11.4% | 3.5% | 6.3% | 0.0% | 3.04 | 2 |
Flynn L Auchey | 2005 | 9.9% | 52.3% | 33.5% | 2.9% | 1.4% | 0.0% | 2.72 | 2 |
Walid Y Thabet | 2004 | 8.3% | 55.6% | 25.0% | 2.8% | 8.3% | 0.0% | 2.45 | 1 |